Before Photos |

|

|

|

|

|

|

|


Photo of proposed route of elevated boardwalk gazebo through heavily
vegetated wetlands. The route was successfully cleared while preventing
impact to adjacent wetlands.
EXAMPLE PHOTOS



Curved concrete flumes installed in holding pond.


Photos of stabilized swale system and restored wetlands approximately
15 months after completion.

Completed sodded swale and concrete flume approximately 2 days
after 10" rainfall.



Photo showing silt fence installed in heavily vegetated areas adjacent
to wetlands. Note that area was excavated for burial of flap using
trencher.

Graded and sodded swale per client's request.

Photo of silt fence and hay bales system 12 months after installation.

Photo of sediment/erosion control system on slope. Note silt fence
and hay bales at top of slope. Also, silt fence (with buried flap)
and two rows of sod on top of slope.

Silt fence and hay bales on top of slope at discharge point of
large drainage area.




System of silt fence and hay bales, and seeded and mulched area
approximately 2 weeks after completion.
|
|
PORTFOLIO
Project Experience
Larry Thomas and Company has provided site stabilization and erosion
control measures on many local projects. These projects have included
a wide range of support such as swale design and installation, temporary
stabilization of highly erodible areas, alternative techniques to
solid sodding of storm water retention ponds, installation of concrete
flumes and energy dissipaters, etc. as per D.O.T. design standards
2000.
D.O.T. projects include stabilization of swale adjacent to wetlands,
and also erosion control of Interstate 10 Pensacola,Fl. Escambia
County project ranging from the Alabama state line to Escambia Bay
Bridge. The installation of silt fence,(D.O.T.certified)staked hay
bails, and rock bag ditch blocks, as per D.O.T. design standards
2000.
Also route and design nature and hiking trails.
Because of Larry Thomas and Company's capabilities and expertise,
it has been called upon to serve many local projects at a moments
notice.
Quality Assurance With A Fast Response
Larry Thomas and Company's quality assurance program encompasses
all facets of activity that has a bearing on stabilizing your construction
site and keeping your associated costs to a minimum. Our commitment
to quality assurance is an essential part of every issue we address
form the simplest swale to the most complex siltation and erosion
control systems. It is our goal to keep your site erosion and sediment
to within acceptable limits and to assure that the results are as
cost effective as possible.
It is also our goal to understand our clients needs as well as the
particular projects sites drainage characteristics. While we are
on your project site our FPM's are constantly on the look out for
"trouble spots" which may plague the project in the future.
We ensure fast qualified response. Our office is located in Pensacola,
Florida and we maintain a full inventory of pumps, silt fence, erosion
control blanket, etc. and can mobilize at a moments notice by the
client. We also have instant access to hay bales, sod and other
erosion control materials and can transport these items to your
site as needed to meet your specific requirements.
We also maintain several vehicles and large trailers so that response
times are kept to a minimum, thereby keeping your dollars where
they are needed most, on your project rather than flowing off your
project. We also can provide tractors, bush hogs, box blades, ditch
witches, and many other specialty items.
If you think we can help you. Just contact us at this address.
|
|

|
|
|
After Photos |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|

Photo showing completed elevated boardwalk and gazebo along
route shown in photo above.
|
|
EXAMPLE
PHOTOS

|
|
|
|
|
|
Photos showing completed design of boardwalks, trails, gazebo,
benches, etc. Installed in Springdale Forrest Estates; Pensacola,
Florida.
|
|

|
|
|
|
|
|
Photos showing path through heavy vegetated area as directed by
client. Installation of various woodwork (including signs, benches,
boardwalks, sign pedestals, etc.). Demarcation (with paint)nature
trail as layed out by client. Installed in Magnolia Lake Estates;
Pennsicola, Florida.
|
|
|
|
|
|
|
|
These photos were taken immiedately after a 4" rain within
a 2.5 hour period. Note turbulence at dissipator, and high velocity
curlex still in place.
|
|
|
|
|