Before Photos

 




 


Photo of proposed route of elevated boardwalk gazebo through heavily vegetated wetlands. The route was successfully cleared while preventing impact to adjacent wetlands.





EXAMPLE PHOTOS




Curved concrete flumes installed in holding pond.


Photos of stabilized swale system and restored wetlands approximately 15 months after completion.

Completed sodded swale and concrete flume approximately 2 days after 10" rainfall.



Photo showing silt fence installed in heavily vegetated areas adjacent to wetlands. Note that area was excavated for burial of flap using trencher.

Graded and sodded swale per client's request.

Photo of silt fence and hay bales system 12 months after installation.

Photo of sediment/erosion control system on slope. Note silt fence and hay bales at top of slope. Also, silt fence (with buried flap) and two rows of sod on top of slope.

Silt fence and hay bales on top of slope at discharge point of large drainage area.



System of silt fence and hay bales, and seeded and mulched area approximately 2 weeks after completion.

PORTFOLIO

Project Experience
 
Larry Thomas and Company has provided site stabilization and erosion control measures on many local projects. These projects have included a wide range of support such as swale design and installation, temporary stabilization of highly erodible areas, alternative techniques to solid sodding of storm water retention ponds, installation of concrete flumes and energy dissipaters, etc. as per D.O.T. design standards 2000.
 
D.O.T. projects include stabilization of swale adjacent to wetlands, and also erosion control of Interstate 10 Pensacola,Fl. Escambia County project ranging from the Alabama state line to Escambia Bay Bridge. The installation of silt fence,(D.O.T.certified)staked hay bails, and rock bag ditch blocks, as per D.O.T. design standards 2000.
 
Also route and design nature and hiking trails.
 
Because of Larry Thomas and Company's capabilities and expertise, it has been called upon to serve many local projects at a moments notice.
 
Quality Assurance With A Fast Response
 
Larry Thomas and Company's quality assurance program encompasses all facets of activity that has a bearing on stabilizing your construction site and keeping your associated costs to a minimum. Our commitment to quality assurance is an essential part of every issue we address form the simplest swale to the most complex siltation and erosion control systems. It is our goal to keep your site erosion and sediment to within acceptable limits and to assure that the results are as cost effective as possible.
 
It is also our goal to understand our clients needs as well as the particular projects sites drainage characteristics. While we are on your project site our FPM's are constantly on the look out for "trouble spots" which may plague the project in the future.
 
We ensure fast qualified response. Our office is located in Pensacola, Florida and we maintain a full inventory of pumps, silt fence, erosion control blanket, etc. and can mobilize at a moments notice by the client. We also have instant access to hay bales, sod and other erosion control materials and can transport these items to your site as needed to meet your specific requirements.
 
We also maintain several vehicles and large trailers so that response times are kept to a minimum, thereby keeping your dollars where they are needed most, on your project rather than flowing off your project. We also can provide tractors, bush hogs, box blades, ditch witches, and many other specialty items.
 
If you think we can help you. Just contact us at this address.

 

 

    After Photos
 

 
   
 
   
 
   
   
 
   
 
   
 
   
 
   

 

Photo showing completed elevated boardwalk and gazebo along route shown in photo above.

 

 

 

EXAMPLE PHOTOS

 

 


 

Photos showing completed design of boardwalks, trails, gazebo, benches, etc. Installed in Springdale Forrest Estates; Pensacola, Florida.

 

 

 



 

 


Photos showing path through heavy vegetated area as directed by client. Installation of various woodwork (including signs, benches, boardwalks, sign pedestals, etc.). Demarcation (with paint)nature trail as layed out by client. Installed in Magnolia Lake Estates; Pennsicola, Florida.

 


 




 


 


These photos were taken immiedately after a 4" rain within a 2.5 hour period. Note turbulence at dissipator, and high velocity curlex still in place.

 


 

 

 